Choose the Process Before You Quote the Part
The same geometry can be milled, turned, stamped or moulded at very different costs. Read the drawing for material, tolerance, finish and volume before committing to a process route.
Wikimedia Commons・CNC Mill 1.jpg・CC BY-SA 4.001Three process families
Process selection starts with what happens to the material: it is removed, formed or introduced into a mould. Each route has a different balance of tooling cost, cycle time and achievable detail. The drawing narrows the options, while production volume determines which option is economical.
| Family | Typical processes | Up-front cost | Cost per piece | Suits batches of |
|---|---|---|---|---|
| Cutting (removal) | Milling, turning, drilling, grinding, EDM | Low (fixtures) | High | 1 to a few thousand |
| Forming (deformation) | Stamping, bending, forging, drawing, rolling | High (tooling) | Very low | Thousands upward |
| Moulding (filling) | Injection moulding, die casting, powder metallurgy | Very high (tooling) | Very low | Tens of thousands |
02Machining and its limits
Milling, turning, drilling and grinding all remove material. Cutting offers flexible geometry and tight control, but stock loss, tool wear and cycle time can make it expensive at volume. Compare these costs with the shape and tolerance the part actually needs.
The ladder of operations and accuracy
| Operations | Typical tolerance | Typical Ra | What it asks |
|---|---|---|---|
| Rough milling / turning | ±0.2 mm | 6.3~12.5 | Leaves stock, aims at removal rate |
| Finish milling / turning | ±0.05 mm | 1.6~3.2 | Final cut for ordinary fitting surfaces |
| Reaming / boring | IT7 (±0.01 class) | 0.8~1.6 | Hole accuracy and cylindricity |
| Surface / cylindrical grinding | IT5~IT6 | 0.2~0.8 | Hard material, finishing after heat treatment |
| Lapping / honing | IT4 and better | 0.05~0.2 | Sealing faces, gauges, cylinder bores |
Five-axis and mill-turn
Every new setup introduces another opportunity for locating error. Multi-axis or mill-turn machines can keep more operations in one setup, which may help both cycle time and positional accuracy. Whether that advantage is worth the machine cost depends on the part.
03Forming and tooling cost
Stamping, bending, forging and drawing reshape material without cutting most of it away. Once the tooling is in place, cycle times can be short, but die cost and design constraints make production volume decisive.
Sheet-metal clues on the drawing
- Uniform thickness. The whole drawing carries one thickness dimension; everything else is outline and hole positions.
- Bend lines and bend radii. Too small a radius cracks; the usual floor is one material thickness for soft material and two for hard.
- Flat pattern or developed length. Some customers supply the developed length; sometimes you must work it out.
- Distance from hole to bend line. A hole too close to a bend distorts when formed; the usual requirement is more than 2.5 times thickness plus the radius.

What a forging looks like on paper
A forging drawing may show a near-net outline beside the final machined profile. Draft, parting line and machining allowance reveal which surfaces need stock removed and where the process can hold tolerance.
04Moulding and wall thickness
Injection moulding is common for plastics and also has powder-based metal variants. Uniform wall thickness, draft, ribs, gates and ejector locations are clues that the part was designed around a moulding process.
| Design item | Usual guidance | What happens if you ignore it |
|---|---|---|
| Wall thickness | Uniform, varying by no more than 25% | Shrinkage, sink marks, internal stress |
| Rib thickness | 50–60% of the main wall | Sink marks at the rib root |
| Draft angle | 0.5°–2° per side | Scuffing on ejection, stress whitening |
| Corner radii | Not less than half the wall thickness | Stress concentration, cracking |
| Gate position | Feed into the thick section, away from cosmetic faces | Short shots, flow marks, weld lines |
05Drawing details that change cost
- Tolerance grade. A general tolerance (ISO 2768-m) and an individually called-out IT7 are two different processes.
- Surface finish. Ra 3.2 comes off a single milling pass; Ra 0.4 almost always means grinding.
- Geometric tolerance. Position Ø0.05 may mean the whole feature has to be finished in one set-up.
- Material. SUS304 machines far worse than S45C; tool life and cycle time both change.
- Heat treatment. Placing it before or after finishing reorders the whole routing, and the distortion it causes has to be allowed for as stock on the drawing.