Contact Try it now

← Back to blog

Quality managementReading time 12 min

Cp, Cpk and Ppk: Read the Numbers in Context

Capability indices are useful only when the measurement system and process behavior support them. See what each index measures, why centering matters and when a good-looking Cpk is misleading.

Cpk

01What each index measures

IndexWhich variationAccounts for offsetAnswers
CpWithin-subgroup (short term)NoIs the spread of the process small enough
CpkWithin-subgroup (short term)YesHow much margin is left once the offset is taken off
PpOverall (long term)NoSpread including between-lot variation
PpkOverall (long term)YesWhat you actually shipped
C indices use within-subgroup variation; P indices use overall variation across the sample.

Cp compares the specification width with the process spread; it does not say whether the process is centered. Cpk also measures how close the process mean is to the nearest limit. That is why Cpk cannot exceed Cp, and why the two numbers should be read together.

02Capability and defect rates

CpkEquivalent sigma levelTheoretical defect rate (two-sided)Where it is usually required
1.003σ2700 ppmNo longer accepted in most industries
1.334σ63 ppmThe basic threshold in general industry
1.675σ0.57 ppmAutomotive, critical characteristics
2.006σ0.002 ppmThe six sigma target
Defect-rate conversions depend on distribution and centering assumptions; verify them before use.

Converting capability indices to defect rates requires assumptions about the distribution. Characteristics with a natural boundary, such as runout or roundness, may not follow a normal distribution. Check the data before using a textbook conversion.

03Check process stability first

A capability index describes a process only if the process is stable. If the mean drifts or special causes are still active, the calculated Cpk summarizes the sample period but is a poor prediction of future output.

How to confirm it

  1. Plot a control chart (X̄-R or X̄-s) and confirm no points fall outside the control limits.
  2. Look for non-random patterns: seven consecutive points on one side, seven consecutive rising or falling, cyclic behaviour, or data hugging the centre line (which usually means the subgrouping is wrong).
  3. Confirm the sources of variation have been identified and controlled: tool changes, material changes, shift changes, temperature.
  4. Only once all of that holds should you calculate a capability index.

04Choosing a sample

Too few observations make an index uncertain. Sample across operators, shifts, lots and enough time to capture the variation that production actually sees; then report the sample size with the result.

Sample size n95% lower confidence limit on a point estimate of Cpk 1.33What it asks
30About 1.02A very wide interval; easy to misjudge
50About 1.10Still wide
100About 1.18Acceptable
200About 1.23More reliable
Capability estimates have uncertainty, especially with small samples.

05Use the drawing limits

Capability needs measured values, not just pass/fail marks. Keep the numbers so you can see centering, drift and spread even while every part remains within tolerance.

Finally, verify the specification limits themselves. An incorrectly copied tolerance can make a mathematically correct index meaningless. Trace the limits back to the current drawing revision.