Production managementReading time 12 min
OEE: Know What Goes Into the Denominator
A machine can be running most of the shift and still deliver poor OEE. Availability, performance and quality each remove a different kind of loss. Define the planned time before comparing numbers.
01Availability, performance and quality
| Metric | Calculation | What it deducts |
|---|---|---|
| Availability | Actual running time ÷ loading time | Breakdowns, changeovers, material changes, waiting |
| Performance | (Ideal cycle time × output) ÷ actual running time | Idling, minor stops, reduced speed |
| Quality | Good pieces ÷ total pieces | Defects, rework |
| OEE | The three multiplied | — |
02Six common losses
| Loss | Which factor | Typical cause |
|---|---|---|
| Equipment failure | Availability | Unplanned stops, waiting for repair |
| Set-up and adjustment | Availability | Changeover, first-piece adjustment |
| Idling and minor stops | Performance | Jams, sensor misfires, tens of seconds each time |
| Reduced speed | Performance | Tool wear, or slowing down out of caution |
| Process defects and rework | Quality | Parameter drift, material variation |
| Start-up losses | Quality | Scrap between switching on and settling down |
03OEE versus TEEP
- OEE uses loading time as the denominator and asks whether the scheduled hours were used well.
- OOE uses operating time, including planned downtime.
- TEEP uses calendar time (24 × 365) and asks how much of the machine's capacity is being used at all. It is an investment metric.
OEE and TEEP answer different questions. OEE looks at losses during planned production time; TEEP also accounts for unused calendar time. A high-mix shop with frequent changeovers should not be compared directly with a continuous production line without understanding those differences.
04Find the largest loss first
- Low availability → changeover time is the first target. SMED separates changeover work into internal tasks, which need the machine stopped, and external tasks, which can be prepared while it still runs. Converting internal into external routinely halves changeover time.
- Low performance → measure the minor stops first. Most plants do not record stoppages under three minutes; making them visible comes before anything else.
- Low quality → go back to process capability (Cpk) and the measurement system (GR&R), and establish whether the process is genuinely unstable or the measurement is misjudging.
05Where the data comes from
To calculate the three OEE factors, record running and stopped time, actual output against the ideal cycle, and good versus rejected units. Define each source consistently before comparing shifts or machines.
- State comes from machine I/O, current sensing or the CNC interface, far more accurate than a hand-written log.
- Output comes from counters, sensors or labour reporting.
- Good count comes from inspection records, and the basis for inspection comes from the drawing.
Quality data must be based on the correct acceptance limits. If inspection criteria are copied incorrectly from a drawing, the reported reject count—and therefore OEE's quality factor—can be misleading.