FMEA Action Priority: What Changed After RPN
Multiplying severity, occurrence and detection can hide a severe failure behind a low RPN. The newer Action Priority approach changes how teams decide what to address first—and what evidence to record.
01Severity, occurrence and detection
| Item | Asks | A score of 1 | A score of 10 |
|---|---|---|---|
| Severity S | How serious the consequence is when the failure occurs | Almost no effect | Affects safety or violates regulation, without warning |
| Occurrence O | How often this cause happens | Practically impossible | Very high, happening continuously |
| Detection D | How easily current controls catch it | Almost certain to be caught | Cannot be detected, or is never checked |
02Why RPN can mislead
Traditional RPN multiplies severity, occurrence and detection into one score. Different risk profiles can produce the same result, so a single threshold may hide a severe failure mode. Action Priority evaluates the three ratings in a defined order instead of treating every product as equivalent.
- The same product, different meaning. 9×2×2 = 36 and 2×9×2 = 36 score identically, but the first is a safety issue and the second a common cosmetic flaw.
- It is discontinuous. Of 1000 possible products only 120 are distinct values, so a great many items tie.
- It invites gaming. To get under the threshold, change D from 7 to 6 and it passes, which changes the number, not the risk.
03Using Action Priority
The AIAG-VDA method introduced Action Priority in place of a simple RPN threshold. A priority table considers severity first, then occurrence and detection, producing a high, medium or low action priority.
| Situation | AP | Meaning |
|---|---|---|
| S 9-10 with O 4-10 | H | Action must be taken, or a reason given for not taking it |
| S 9-10 with O 2-3 and high D | H | As above |
| S 7-8 with O 6-10 | H | High priority |
| Mid-range combinations | M | Action should be taken, or the rationale recorded |
| Low S with low O | L | Action may be omitted, but record it |
High priority does not mean the team must somehow force the result to low. It means the risk needs an action or a documented reason for not taking one. The aim is a defensible decision, not a better-looking score.
04The seven-step approach
- Planning and preparation. Define the scope, project boundaries and participants (the 5T: intent, timing, team, task, tool).
- Structure analysis. Break the system into three levels: system, subsystem, and component or process step.
- Function analysis. What each level has to do, expressed so it can be measured.
- Failure analysis. The chain of failure effect, failure mode and failure cause.
- Risk analysis. Rate S, O and D and look up the AP.
- Optimisation. Propose actions for H and M items, assign owners and dates, and re-rate.
- Documenting results. Communication and records, internal and external.
05Keep FMEA current
FMEA should change when the process changes. A complaint, new failure mode, revised control or updated drawing is a reason to review it with the people who run and inspect the process.
- a customer complaint or a serious internal defect (D7 of an 8D should go back and change the FMEA)
- a design change, material change or supplier change
- a change of process parameters or equipment
- a clear gap between the actual early-production defect rate and the O originally rated