An inspection report must show what was checked, how it was measured and whether it passed. Follow the path from ballooned drawing to recorded results, including first-article and sampling decisions.

01Balloon the drawing

Ballooning assigns a unique number to each drawing requirement that must be inspected. The same number appears on the report beside the measured result. This simple link lets a reviewer trace every value back to the exact location and callout on the drawing.

What gets a number

  • Every toleranced dimension, whether individually called out or covered by the general tolerance.
  • Every feature control frame, together with its datums.
  • Every surface finish symbol, including the global default near the title block.
  • Notes covering material, heat treatment and surface treatment.
  • Thread specifications, deburring requirements, marking and packaging requirements.

02First-article forms

AS9102 organizes aerospace first-article inspection into three forms covering the part, materials and processes, and product characteristics. Other industries may use a similar structure, but their customer requirements still govern.

FormContentsThe question it answers
Form 1Part identity, drawing number, revision, part numberWhich revision of which part is this
Form 2Evidence for material, special processes and functional testsIs there proof behind the material and the processes
Form 3Measured result and verdict for every specificationWhat did each dimension actually measure
AS9102 organizes first-article records into three forms; Form 3 contains characteristic results.

What one row of Form 3 needs

FieldContentsCommon mistake
Balloon numberMatches the number on the drawingNumbering does not match the drawing
SpecificationNominal and deviations from the drawingNominal only, no tolerance
Measured valueThe number actually obtainedWriting “OK” instead of a value
InstrumentWhich gauge, and its identification numberLeft blank, so nothing is traceable
VerdictPass or failBorderline values not rounded to a stated rule
NotesConcession, rework, measurement conditionsEmpty
A report should identify the gauge used so each measured result can be traced.

03Planning the sample size

Sampling answers two separate questions: how many units to inspect and what acceptance rule to apply. A standard such as ISO 2859-1 provides plans for attribute inspection; choose the plan to match the agreed quality level and inspection conditions.

BatchCode letter, general inspection level IISample sizeAc / Re at AQL 1.0
51 ~ 90E130 / 1
91 ~ 150F200 / 1
151 ~ 280G321 / 2
281 ~ 500H501 / 2
501 ~ 1200J802 / 3
Example attribute-sampling plan. Use the inspection level and AQL agreed for the lot.

A sampling plan manages acceptance risk; it does not prove every shipped unit is defect-free. Critical characteristics may need a stricter plan or complete inspection, depending on the customer and the risk.

04From results to capability

Keep the measured values, not only pass/fail. Actual results reveal trends, centering and drift that a binary verdict hides, and provide data for later capability analysis.

MetricConceptWhat it looks at
CpTolerance band ÷ 6σWhether the spread is small enough
CpkAlso accounts for the mean being off centreWhether it leans to one side
Pp / PpkCalculated from long-term overall variationReal performance including between-lot variation
Cp and Cpk answer different questions: spread alone versus spread with centering.

Cpk targets vary by customer and characteristic. Before comparing any result with a target, check that the process is stable and the measurement system is suitable; a calculated index alone is not evidence of control.