Industrial robotsZhongli, Taoyuan
Hi-More Co., Ltd.
Hi-More supplies industrial robots to the United States, Southeast Asia and Europe. Customer drawings arrive in different languages, units and title-block formats.

Every customer drawing needed rework
Before release to production, an engineer replaced the title block, translated notes, converted imperial dimensions and applied the approval stamp. Each drawing took about 40 minutes, with more than 100 processed each month.
Prepare a review-ready shop drawing
CADASU applies the internal title block, translates notes, converts units, carries over the drawing number and revision, and exports a file for human approval.
More than 60 engineering hours saved
Processing time fell from 40 minutes to seven minutes per drawing. At the monthly volume, the engineering team recovered more than 60 hours.
“Our customers are in four time zones, so drawing conventions will never be uniform. The way to make them uniform is to let the machine do it.”
Hi-More
Test a customer drawing
Bring a drawing that needs translation, unit conversion or a new title block. We will run the workflow with you.